Past Performance
Our proven track record delivering critical infrastructure projects for federal agencies. Browse by project category to see specifications and outcomes.
Result: Aggregate stockpile staged within the performance window, supporting Bureau of Reclamation and USFWS refuge road rehabilitation projects.
Result: Flexible base successfully delivered and staged across multiple levee segments, supporting IBWC’s flood control infrastructure and levee resurfacing program.
Result: Multi-material project staged and delivered via barge and on-island haul, supporting refuge roadway rehabilitation and erosion control needs within adjusted hurricane-season schedule.
Result: All levee rehabilitation materials delivered to Lake Woodruff NWR, supporting critical refuge flood protection infrastructure.
Result: Road material delivered and staged for stabilization of access routes at Everglades Headwaters National Wildlife Refuge, ensuring compliance with environmental and access constraints.
Result: Aggregate and cobble staged across marsh areas and access roads, supporting refuge infrastructure maintenance and habitat protection.
Result: Aggregate staged and delivered within the 30-day performance period, supporting roadway and infrastructure improvements at JBLM.
Result: Aggregate delivered and staged within the 30-day performance period, supporting roadway and facility maintenance at Rock Island Arsenal.
Result: Aggregate staged and delivered on schedule, meeting ISPWC gradation standards for subbase, base, and surface layers at the NIFC Mobility Center.
Result: Aggregate supplied and staged within the 30-day performance window, supporting refuge access road stabilization.
Result: Aggregate delivered within 30-day period, supporting Fort McCoy roadway and training site stabilization needs.
Result: All road base delivered within the performance period, meeting CDOT specifications and supporting park roadway upkeep.
Result: One week delivery of materials.
Result: Contract completed withing four delivery days with full acceptance from the Fish and Wildlife Service
Result: Enhanced roadway surfaces, and drainage at Camp Sherman Joint Training Center.
Result: Smooth compliant delivery, supporting refuge infrastructure and erosion control efforts.
Result: All tonnage delivered within schedule, meeting FDOT gradation and LBR requirements, ensuring stabilized trail conditions for public and operational access.
Result: Established long-term agreement ensuring rapid supply of skid boards for training and operational missions.
Result: Installation and Equipment Provided with no issue
Result: Replaced inadequate compactor with modern equivalent
Result: Accomplished delivery with compliant requirements
Result: a series of design documents, including site plans, schematic drawings, and detailed construction drawings